Harrier
The Harrier Project is north of Mt Gunyan and consists of old workings from the Tuliamba Mine, with historic production of 81 tonnes at 11% Cu, mined from 1920 to 1922. Exploration conducted in 2010 at Harrier consisted of 9 drill holes, and has identified Harrier as a potential low sulphidation, fine grained mineral deposit with a strike length of 350m to a depth of 150m. The purpose of the drilling was to further investigate the Cu-Zn mineralization from previous exploration.
Reported drilling results at Harrier have delivered:
ACHRD006 1.5m @ 3.2% Cu, 2.7% Zn, 129g/t Ag, 0.6% Pb from 89.2m